The overall amount of water on our planet has remained the same for 2 billion years.
| Contract # | Description | Bid Date | Deposit |
|---|---|---|---|
| 12-206-006 | SEWER TELEVISION INSPECTION SERVICES IN ALL AREAS OF THE CITY OF BOSTON. | 2/23/2012 11:30 AM |
Yes |
| Bid/contract documents, may be obtained from the Procurement office Boston Water and Sewer Commission, 980 Harrison Avenue, Boston, MA 02119, Monday through Friday 9:00 AM to 4:30 PM. The estimated cost for this project is approximately $127,000.00. Plans will be available on or after Monday January 30, 2012 | |||
| Contract # | Description | Bid Date | Deposit |
|---|---|---|---|
| 12-309-008 | MASS AVE - DORCHESTER SEPARATION. | 2/22/2012 10:00 AM |
Yes |
| This project includes the installation of approximately: 3,870 linear feet (L.F.) of ductile iron cement-lined (DICL) pipe for water main, 11,700 L.F. of 10- inch to 48-inch fiberglass reinforced pipe, reinforced concrete pipe, ductile iron and PVC pipe for sewers and storm drains as well as 910 L.F. of pipe rehabilitation; 1,000 L.F. of minor drain installation; furnish and set 62 manholes, 30 catch basins; reset or install 11 hydrants, and 37 water valves. The engineer's estimate for this contract is approximately $8,700,000.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday January 25, 2012. | |||
| 11-309-001 | REPLACEMENT AND REHABILITATION OF DRAIN AND SEWER PIPES IN ALLSTON/BRIGHTON, BACK BAY/BEACON HILL, CITY PROPER, DORCHESTER, EAST BOSTON, FENWAY/KENMORE, JAMAICA PLAIN, ROXBURY AND WEST ROXBURY. | 2/29/2012 11:00 AM |
Yes |
| The work includes the replacement of approximately 1,600 linear feet of pipe, rehabilitation of 4,000 linear feet of pipe, and 100 linear feet of point repairs. The work also includes the modification of (2) stromwater regulators and installation of (2) tidegates. The engineer's estimate for this contract is approximately $1,450,000.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday February 01, 2012. | |||
| 12-309-004 | MASS AVE - ROXBURY SEPARATION. | 2/29/2012 10:00 AM |
Yes |
| This project includes the installation of approximately: 11,420 linear feet (L.F.) of ductile iron cement-lined (DICL) pipe for water main, 19,795 L.F. of 10-inch to 48-inch fiberglass reinforced pipe, reinforced concrete pipe, ductile iron and PVC pipe for sewers and storm drains as well as 280 L.F. of pipe rehabilitation; furnish and set 93 manholes, 82 catch basins; reset or install 30 hydrants, and 105 water valves. The engineer's estimate for this project is approximately $ 14,494,000.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday January 18, 2012. | |||
| 11-309-009 | WATER AND SEWERAGE WORKS IMPROVEMENTS IN ROXBURY | 3/14/2012 10:00 AM |
Yes |
| The work under this contract includes the installation of approximately 14,300 linear feet of storm drains and sanitary sewers, approximately 2,300 linear feet of minor drain, approximately 6,000 linear feet of replacement water mains, the rehabilitation of approximately 2,600 linear feet of sanitary sewers and storm drains. The engineer's estimate for this contract is approximately $14,515,000.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday February 01, 2012. | |||