Site Navigation

Customer Login

Need help logging in?

Did You Know?

On average Bostonís residents, workers and visitors use about 71 million gallons of water every day.

Invitation To Bid

Goods and Services

Contract # Description Bid Date Deposit
17-201-001 **NEW BID TIME**HVAC MAINTENANCE AND REPAIRS AT THE COMMISSION FACILITIES, BOSTON, MA 9/29/2016
11:00 AM
Yes
  Bid/contract documents, may be obtained from the Procurement Office Boston Water and Sewer Commission, 980 Harrison Ave., Boston, MA 02119. Monday thru Friday 9:00 AM to 4:30 PM. Bid documents will be available on or after Wednesday September 7, 2016. * A PRE-BID MEETING WILL BE HELD AT THE COMMISSION HEADQUARTERS ON SEPTEMBER 17, 2016 AT 10:00 AM.
17-201-002 THREE YEAR CONTRACT FOR SOLID WASTE DISPOSAL SERVICES 9/30/2016
11:00 AM
No
  Bid/contract documents, may be obtained from the Procurement Office Boston Water and Sewer Commission, 980 Harrison Ave., Boston, MA 02119. Monday thru Friday 9:00 AM to 4:30 PM. Bid documents will be available on or after Wednesday September 7, 2016. * A PRE-BID CONFERENCE WILL BE HELD AT THE COMMISSION HEADQUARTERS ON THURSDAY SEPTEMBER 22, 2016 AT 10:00 AM.

Construction Projects

Contract # Description Bid Date Deposit
16-309-001 REHABILITATION OF SEWER AND DRAIN PIPES CITY WIDE 9/29/2016
10:00 AM
Yes
  The work includes the rehabilitation of approximately 10,255 linear feet of existing sewer and drain pipes and 17 excavated point repairs. The engineer's estimate for this job is $1,395,740.20. There will be a non-refundable charge of $25.00 for each set of contract documents taken out. Plans will be available on or after Wednesday August 31, 2016.
16-309-008 WATER, SEWER AND DRAINAGE WORKS IMPROVEMENTS - ROADWAY RESURFACING IN VARIOUS LOCATIONS IN BOSTON. 10/6/2016
10:00 AM
Yes
  The work in this contract includes the resurfacing of approximately 92,000 square yards of roadway. This includes the permanent trench repair of existing water, sewer and drain trench patches, cold planning of bituminous pavement of granite curb and curb inlets, repair of sidewalks, and all other incidental work needed to complete the work as specified in these contract specifications. The engineer's estimate for this job is $4,700,000.00. There will be a non-refundable charge of $25.00 for each set of contract documents taken out. Plans will be available on or after Wednesday September 07, 2016.
17-303-010 CATCH BASIN CLEANING I 10/19/2016
10:00 AM
Yes
  Provide services to clean catch basins and drop inlets and to transport all cleaning debris to Charlestown. The engineer's estimate for this job is $450,000.00. There will be a non-refundable charge of $25.00 for each set of contract documents taken out. Plans will be available on or after Wednesday September 21, 2016.
17-303-011 CATCH BASIN CLEANING II 10/20/2016
10:00 AM
Yes
  Provide services to clean catch basins and drop inlets and to transport all cleaning debris to Charlestown. The engineer's estimate for this job is $450,000.00.There will be a non-refundable charge of $25.00 for each set of contract documents taken out. Plans will be available on or after Wednesday September 21, 2016.

 

Footer

Copyright © 2016 Boston Water and Sewer Commission 980 Harrison Ave. Boston, MA 02119 617-989-7000