Site Navigation

Customer Login

Need help logging in?

Did You Know?

If using rain barrels under downspouts to collect rain water for your garden, use a lid, mesh fabric, or several drops of baby oil on the surface of the water to prevent mosquitoes from breeding.

Invitation To Bid

Goods and Services

Contract # Description Bid Date Deposit
15-201-013 CONCRETE REPAIR SERVICES AT THE COMMISSION MATERIAL HANDLING FACILITY, ALFORD STREET BOSTON, MA 9/10/2015
10:00 AM
No
  Bid/contract documents may be obtained from the Procurement office, Boston Water and Sewer Commission, 980 Harrison Ave., Boston, MA 02119. Monday thru Friday 9:00 AM to 4:30 PM. Bid/ contract documents will be available on or after Wednesday August 19, 2015. * There will be a pre-bid conference and tour held at the Commission Facility on September 2, 2015 at 10:00 AM
15-103-006 FOR THE PURCHASE OF FORD BRASS PARTS 9/11/2015
11:00 AM
No
  Bid/contract documents may be obtained from the Procurement office, Boston Water and Sewer Commission, 980 Harrison Ave., Boston, MA 02119. Monday thru Friday 9:00 AM to 4:30 PM. Bid/ contract documents will be available on or after Thursday August 27, 2015.
15-201-016 INSTALLATION OF METER TRANSMISSION UNITS (MTU) IN THE COMMISSION'S AUTOMATIC METER READING INFRASTRUCTURE. 9/17/2015
10:00 AM
No
  Bid/contract documents may be obtained from the Procurement office, Boston Water and Sewer Commission, 980 Harrison Ave., Boston, MA 02119. Monday thru Friday 9:00 AM to 4:30 PM. Bid/ contract documents will be available on or after Wednesday August 19, 2015.

Construction Projects

Contract # Description Bid Date Deposit
15-308-002 CLEANING AND CEMENT LINING OF WATER MAINS IN JAMAICA PLAIN AND FENWAY/KENMORE 9/3/2015
10:00 AM
Yes
  The work under this contract includes the cleaning and cement lining of approximately 7,150 linear feet of existing 12" water pipe, replacing of approximately 200 linear feet of existing 8" water pipe, furnishing and installing all connecting pipes, valves and all other incidental work. The engineer's estimate is $2,687,244.00. There will be a non-refundable charge of $25.00 for each set of contract documents taken out. Plans will be available on or after Wednesday August 05, 2015.

 

Footer

Copyright 2015 Boston Water and Sewer Commission 980 Harrison Ave. Boston, MA 02119 617-989-7000