Invitation To Bid

Goods and Services

No Invitations to Bid at this time.

Construction Projects

Contract # Description Bid Date Deposit
17-308-004 REPLACEMENT OF WATER MAINS AND SEWERS IN CITY PROPER - NORTH END PHASE III 4/25/2018
10:00 AM
Yes
  The work includes the replacement of approximately 2,080 linear feet of water mains, the replacement of 175 linear feet of combined sewer pipe, and the abandonment of combined sewer and water mains. The engineers estimate for this contract is approximately $2,670,000.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday April 11, 2018.
16-308-006 REPLACEMENT AND REHABILITATION OF WATER MAINS, STORM DRAINS AND SEWERS IN ALLSTON/BRIGHTON, BROOKLINE, BACK BAY/BEACON HILL, AND FENWAY/KENMORE 5/3/2018
10:00 AM
Yes
  The work includes the replacement of approximately 3,815 linear feet of 4-inch to 16-inch water pipe, the rehabilitation of approximately 1,000 linear feet of 12-inch to 15-inch sewer and drain pipes, and point repairs of existing sewer and drain pipes in two (2) locations. The engineers estimate for this contract is approximately $4,000,000.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday April 11, 2018.
16-309-005 *NEW BID DATE*SEWER, DRAIN AND WATER WORKS IMPROVEMENTS IN EAST BOSTON - EAST BOSTON SEWER SEPARATION PHASE I 5/3/2018
11:00 AM
Yes
  The work under this contract includes sewer separation by installing approximately 3,600 linear feet of 12", 15", 16", 18" and 24" drain pipe; the replacement of approximately 300 linear feet of 12" and 27" sewer pipe and the cleaning and trenchless lining of approximately 2,130 linear feet of 24"x27" and 16"x24" combined sewers. The work in East Boston also includes the replacement of 1935 linear feet of 12" and 8" water pipe. The engineers estimate for this contract is approximately $4,300,000.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday March 28, 2018.
17-401-003 CONSTRUCTION OF GREEN INFRASTRUCTURE AT THREE BOSTON PUBLIC SCHOOLS 5/4/2018
10:00 AM
Yes
  This contracts will construct green infrastructure (“GI”) at three Boston public schools; the David A. Ellis Elementary School (“Ellis”), Jackson Mann K-8 and Horace Mann School for Deaf and hard of hearing (“Jackson Mann”) and Edward M. Kennedy Academy for Health careers (“Kennedy”). GI Designs at the three schools focus on capturing and treating stormwater from paved areas while enhancing the school yards. At the Ellis, a bioretention area, which is the centerpiece of this construction project, along with an enhanced tree trench, will treat stormwater from the play area and some of the paved driveway. At the Jackson Mann, a bioretention area and vegetated swale will manage stormwater from concrete plaza, bus lane and parking lot, a stormwater planter will treat runoff from a handicap ramp and medicinal garden with a cistern will provide educational opportunities for students and teachers. The engineers estimate for this contract is approximately $523,155.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday April 11, 2018.

 