Site Navigation

Customer Login

Need help logging in?

Did You Know?

If you hold a bucket underneath your showerhead for 20 seconds and more than a gallon of water accumulates, you should install a low-flow showerhead to save water.

Invitation To Bid

Goods and Services

Contract # Description Bid Date Deposit
18-103-007 FOR THE PURCHASE OF MANHOLE FRAMES AND COVERS 6/21/2018
11:00 AM
Yes
  BID/CONTRACT DOCUMENTS, MAY BE OBTAINED FROM THE PROCUREMENT OFFICE BOSTON WATER AND SEWER COMMISSION, 980 HARRISON AVENUE, BOSTON, MA 02119, MONDAY THRU FRIDAY 9:00 AM TO 4:30 PM. BID DOCUMENTS WILL BE AVAILABLE ON OR AFTER MONDAY JUNE 04, 2018.
18-103-006 FOR THE PUCHASE OF RESIDENTIAL WATER METERS 7/10/2018
10:00 AM
Yes
  BID/CONTRACT DOCUMENTS, MAY BE OBTAINED THE PROCUREMENT OFFICE BOSTON WATER AND SEWER COMMISSION, 980 HARRISON AVENUE, BOSTON, MA 02119, MONDAY THRU FRIDAY 9:00 AM TO 4:30 PM. CONTRACT DOCUMENTS WILL BE AVAILABLE ON OR AFTER MONDAY JUNE 18, 2018.
18-103-004 FOR THE PURCHASE OF LARGE WATER METERS 7/10/2018
10:30 AM
Yes
  BID/CONTRACT DOCUMENTS, MAY BE OBTAINED THE PROCUREMENT OFFICE BOSTON WATER AND SEWER COMMISSION, 980 HARRISON AVENUE, BOSTON, MA 02119, MONDAY THRU FRIDAY 9:00 AM TO 4:30 PM. CONTRACT DOCUMENTS WILL BE AVAILABLE ON OR AFTER MONDAY JUNE 18, 2018.

Construction Projects

Contract # Description Bid Date Deposit
17-308-005 REPLACEMENT AND REHABILITATION OF WATER MAINS, STORM DRAINS AND SEWERS IN THE SOUTH END 6/21/2018
10:00 AM
Yes
  The work includes replacement of approximately 7,975 linear feet of 6-inch to 16-inch water pipe, replacement of approximately 250 linear feet of 12-inch sewer and drain pipes, and point repairs of existing sewer and drain pipes at two (2) locations. The engineer's estimate for the contract is approximately $6,975,000.00. There will be a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday May 30, 2018

 

Footer