Site Navigation

Customer Login

Need help logging in?

Did You Know?

Most lawns need just one inch of water a week.

Standard Details

The following represent the most commonly used standard details for water and wastewater projects by the Boston Water and Sewer Commission. Other non-standard details are available upon request through the Engineering Department. The user should be aware that the Commission updates its standard details on a regular basis.

Number Description View Download
C-13 Vehicular ramp over temporary bypass pipe pdf icon
F-01 Boston 3/4" main tube cap pdf icon
F-02 Boston 1-1/2" main tube cap pdf icon
F-03 3/4" main shoe pdf icon
F-04 1-1/2" main shoe pdf icon
F-06 G frame and cover pdf icon
F-08 Type A manhole shallow frame pdf icon
F-11a 24-Inch Ductile Iron Hinged Manhole Frame and Cover (OPS) pdf icon
F-11b 30-Inch Ductile Iron Hinged Manhole Frame and Cover (OPS) pdf icon
F1-D01 Type A manhole frame pdf icon
< Previous     Next >
Records 41 to 50 of 83

Footer