25-308-009Project Type
"WATER MAIN REPLACEMENT "
Project Summary
"Water Main Relay work includes excavation and replacement of the existing water main, valves and hydrants in your street. This work usually requires all of the properties that are served by the water main being replaced to be placed on temporary water bypass. Temporary water bypass is a pipe that provides water during construction and is generally laid in the gutter with individual hoses to each property. If your water service is lead, it will be replaced with copper to your property line. If lead is found on the property you will be provided documents on the BWSC Lead Replacement Program. The contractor will install temporary paving as the work progresses. Permanent paving will be installed after 90 days. "