• Click the Select a Neighborhood drop-down box above to change neighborhoods
  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Hold down the left mouse button and drag to pan the map
  • Click the plus/minus buttons in the upper left corner to zoom in/out of the map
  • Click the house button in the upper left corner to return to a full view of the city

Detailed Map Instructions/Information:

Project Types

  • The red shapes on the map are street-level projects
  • The purple shapes on the map are featured projects

General

  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Enter an address in the search box, then click a red or purple shape to view the pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Use the Filter By drop-down box below to see summary information for either All, Featured, or Street-Level projects in a neighborhood
  • Then click the View Project Page button for detailed project information 

 

 

Projects (2)

New Boston Main Interceptor Rehabilitation Project

South Boston

Project Contacts

Irene McSweeney, PE, BWSC Chief of Operations, 617-989-7271
Jim Arrigal, Resident Engineer, 617-865-9299

Overall Schedule

Fall 2022 to Winter 2023
View Project Page

South Boston Sewer Separation Project

The impacted area is from Broadway to Andrew Square and the Expressway to Telegraph Hill, and the goal is to remove as much stormwater as possible from the existing combined sewer system.

Project Contacts

Peter Salvatore, PE, Dir. Of Construction BWSC, 617-989-7425
Kareem Bonugli, PE, Deputy Dir. Construction BWSC, 617-989-7449
24/7 Project Hotline, Weston & Sampson, 617-865-9299

Overall Schedule

Summer 2021 - Fall 2027 5 phases
View Project Page