• Click the Select a Neighborhood drop-down box above to change neighborhoods
  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Hold down the left mouse button and drag to pan the map
  • Click the plus/minus buttons in the upper left corner to zoom in/out of the map
  • Click the house button in the upper left corner to return to a full view of the city

Detailed Map Instructions/Information:

Project Types

  • The red shapes on the map are street-level projects
  • The purple shapes on the map are featured projects

General

  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Enter an address in the search box, then click a red or purple shape to view the pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Use the Filter By drop-down box below to see summary information for either All, Featured, or Street-Level projects in a neighborhood
  • Then click the View Project Page button for detailed project information 

 

 

Projects (1)

East Boston Sewer Separation Project

This project is the fourth phase of a multi-year program to separate combined sewers in East Boston. Sewer separation involves installing new storm drains to carry stormwater and using the existing combined sewer to carry sewage. This work will improve water quality by reducing the number and volume of combined sewer overflows (CSOs) to Chelsea Creek and Boston Harbor, which currently occurs when heavy rainfall inundates the combined sewer. In addition to installing new storm drains, the Commission will be replacing or repairing deteriorated sewer pipes and replacing aged water mains. Construction will take place under five (5) separate contracts that will be implemented in various East Boston neighborhoods. Construction is expected to take six years to complete, beginning with the first contract starting in September 2025 and ending with completion of the final contract in the fall of 2031. Please see the linked Project Documents to view the status of the current project as well as the overview map of Phase IV.

Project Contacts

Jeremiah Waite, P.E. , Project Engineer , 617-989-7453
24/7 Project Hotline, Weston & Sampson, 617-372-9158
Project Email:, [email protected]

Overall Schedule

2022 to 2031
View Project Page