• Click the Select a Neighborhood drop-down box above to change neighborhoods
  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Hold down the left mouse button and drag to pan the map
  • Click the plus/minus buttons in the upper left corner to zoom in/out of the map
  • Click the house button in the upper left corner to return to a full view of the city

Detailed Map Instructions/Information:

Project Types

  • The red shapes on the map are street-level projects
  • The purple shapes on the map are featured projects

General

  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Enter an address in the search box, then click a red or purple shape to view the pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Use the Filter By drop-down box below to see summary information for either All, Featured, or Street-Level projects in a neighborhood
  • Then click the View Project Page button for detailed project information 

 

 

Projects (2)

South End / Mass Ave / Infrastructure Improvements

The purpose of this project is to upgrade the water systems within Massachusetts Ave, Albany Street, East Newton Street, Northampton Street and Harrison Avenue.

Project Contacts

Peter Salvatore, Acting Director of Construction, 617-989-7447
Daniel Day, Inspector, 617-719-6612
Derek Grossi, D'Alessandro Corp, 774-297-7947

Overall Schedule

Fall 2018 to Spring 2020
View Project Page

South End Infrastructure Improvements

The project involves replacement of water mains and the replacement and rehabilitation of sewerage and drainage pipes on various streets in the South End. The planned project intends to improve the water distribution system and upgrade aging sewerage and drainage systems in the South End.

Project Contacts

Chris Dzidek, Project Director, 617-989-7450
Curtis Taylor , Inspector, 781-858-8312
Paul Cabral , Umbro & Sons Construction Corp., 857-492-7282

Overall Schedule

July 2017 to November 2019
View Project Page