• Click the Select a Neighborhood drop-down box above to change neighborhoods
  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Hold down the left mouse button and drag to pan the map
  • Click the plus/minus buttons in the upper left corner to zoom in/out of the map
  • Click the house button in the upper left corner to return to a full view of the city

Detailed Map Instructions/Information:

Project Types

  • The red shapes on the map are street-level projects
  • The purple shapes on the map are featured projects

General

  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Enter an address in the search box, then click a red or purple shape to view the pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Use the Filter By drop-down box below to see summary information for either All, Featured, or Street-Level projects in a neighborhood
  • Then click the View Project Page button for detailed project information 

 

 

Projects (2)

Roxbury Sewer Separation Project / Phase I

The three-phase Roxbury project involves upgrading our water and sewer systems and installing new storm drains to separate the stormwater flow from the existing combined sewers. Due to the complexity of the project, traffic detours will be implemented during construction on Dudley Street.

Project Contacts

Peter Salvatore, PE, Acting Director of Construction, 617-989-7447
Michael Rivers, Inspector, 617-293-2289
David Laramee, Albanese D&S, Inc, 617-954-2140

Overall Schedule

Estimated completion: Fall 2019

Project Completion Status: 50 %

View Project Page

Roxbury Sewer Separation Project / Phase II

The scope of the Dudley project includes upgrading our sewer and water systems and installing new storm drains to separate the flow from the existing combined sewers. There may be a minimal amount of water service disruptions to residents in these areas.

Project Contacts

Steve Callaghan, Deputy Director/Construction, 617-989-7438
Mike Rivers, Inspector, 617-293-2289
David Laramee, Albanese D&S, 617-593-3733

Overall Schedule

Spring 2018 to Fall 2020